Dash trying out the new floor |
Dash running over the old carpet one last time |
Dash inspecting the 14 boxes of Vinyl flooring |
Tom cutting and sizing the flooring |
It took about 5 hours to install, and Tom coordinated it, and cut all the pieces. My (Rob) job was easier, as I unpackaged the 5 foot vinyl planks and helped affix some of them. Tom and our friend Will are installing trim tomorrow to finalize it, but it looks great.
And yes, it was already "christened" once. We are SO happy we installed it already!!