Putting in the first frames |
One side Almost all framed! |
In the last blog we removed the the vinyl windows. Framing the new walls was Tom and Will's (our friend and neighbor) job. It took all day to frame up the first side because they had to allow for a window and a wall heating/air conditioning unit.
After the framing, they had to ensure the 2 square windows fit (it did) and that the opening they made on the bottom (rectangular and horizontal) was perfect to slide in the heating/A-C unit (pictured on the floor). It was!
Starting to add plywood |
From the outside |
Plywood installed |
Weather wrap put on and windows installed |
A finished side, complete with windows, heating/AC and 2 Windows! |